Opening Hour

Mon - Sun, 08:00 - 24:00

Call Us

+86-21-58386189

Breaking Down the  Springs: A Brief Look at the ...

Breaking Down the Springs: A Brief Look at the ...

+

31/03/2015 · Breaking Down the Springs: A Brief Look at the Geology and Production. In terms of well productivity, unconventional resource plays are not created equally, and, to throw another wrench in the mix, not all of one particular play is created equally. This goes beyond the geographic 2D perspectives of the play, as the stratigraphic 3D ...

Horizontal Drilling Accelerates In Permian Basin

Horizontal Drilling Accelerates In Permian Basin

+

HighMount Exploration Production is drawing on data from vertical test wells, a 13well horizontal Wolfcamp program, and 3D seismic to develop nextgeneration well and stimulation designs. By placing its laterals more precisely and completing wells more efficiently, the company hopes to improve the already impressive economics of its ...

When did hydraulic fracturing become such a popular ...

When did hydraulic fracturing become such a popular ...

+

Newly released research from the Geological Survey describes hydraulic fracturing (frac) sand deposits and their loions, and provides estimates of frac sand production, consumption, and reserves. A companion map of producing and potential frac sand and resincoated sand source units in the conterminous is also included.

FORMATION MICROIMAGER, MICROSCANNER, AND CORE ...

FORMATION MICROIMAGER, MICROSCANNER, AND CORE ...

+

01/12/1996 · EVANS, D. THORN, DUNN, 1996. "FORMATION MICROIMAGER, MICROSCANNER, AND CORE CHARACTERIZATION OF NATURAL FRACTURES IN A HORIZONTAL WELL IN THE UPPER ALMOND BAR SAND, ECHO SPRINGS FIELD, WYOMING", Stratigraphic Analysis Utilizing Advanced Geophysical, Wireline and Borehole Technology for Petroleum Exploration and Production, Jory A. Pacht, Robert E. Sheriff, Bob F. Perkins

Fully automatic horizontal parting flaskless molding ...

Fully automatic horizontal parting flaskless molding ...

+

Guangdong Zhongzhu Machinery Equipment Co.,LTD.. is a professional manufacturer of fully automatic horizontal parting green sand flaskless casting molding machine and casting convey line.

Sand Problem in Oil Wells

Sand Problem in Oil Wells

+

16/12/2011 · Erosion Sand control was not implemented. Large quantities of sand flowing. Damage of pipe, tubing or others. 6. Blockage of Flow Lines Accumulation of sand. Lowers the production. Plugging flow lines. High amounts will block pipes leading to non productive time. 7.

Oil Sands | ConocoPhillips

Oil Sands | ConocoPhillips

+

Oil Sands. Oil sands are naturally occurring geologic formations that contain a mixture of water, sand and thick, heavy oil that can be found in many parts of the world. The largest oil sands reserves are loed in Canada. As global energy demand grows, Canada's oil sands are emerging as one of the largest and most reliable longterm energy ...

New technology offers sand control option | Offshore

New technology offers sand control option | Offshore

+

15/01/2013 · Besides prematurely killing well production, excessive sand production may cause erosion and the blockage of downhole hardware, seriously damaging or disabling downhole and surface equipment. Over the last few decades, drilling technology has advanced to such an extent that horizontal and multilateral wells are now the norm, with greater ...

Prediction of sand problems of a horizontal well from sand ...

Prediction of sand problems of a horizontal well from sand ...

+

The analysis shows that the well flowing pressure to induce sand production for cased wells are normally lower than that of horizontal wells. The pressure difference mainly depends on the horizontal and axial stress ratio, rock deformation and strength properties.

5 CASE HISTORIES: LUSELAND FIELD HORIZONTAL WELLS

5 CASE HISTORIES: LUSELAND FIELD HORIZONTAL WELLS

+

three different conditions: horizontal wells in three different areas of the field, vertical wells with minimal sand production, and production from the identical vertical wells, but with deliberate encouragement of sand influx (CHOPS). The basic properties and parameters of the Luseland

Shale gas production costs: historical developments and ...

Shale gas production costs: historical developments and ...

+

15/03/2017 · appliion of horizontal drilling and multistage hydraulic fracturing. In the US, the number of horizontal wells has increased from about 9% of total wells drilled in the early 1990s to more than 50 % in 20102. These technical innovations and improvements unlocked the potential for production of gas from tighter shale formations.

Tight Gas Reservoirs – An Unconventional Natural Energy ...

Tight Gas Reservoirs – An Unconventional Natural Energy ...

+

natural gas from tight sands, gas shales, and coalbedmethane reservoirs. At the present time, >25% of daily gas production is recovered from tight and unconventional reservoirs and >25% of daily Canadian oil production is recovered from heavy oil sands. Also, heavyoil production, especially in California, is quite important to the national

SPE SA (0526)

SPE SA (0526)

+

wellbore along with the producing reservoir fluids. Horizontal wellbores oriented at 45o produce minimum sand compared with other horizontal orientations for the studied reservoir. Similar effect is found for perforations phased at zero angular position. Introduction Sand production can be defined as the production of sand

Sand Control: Why and How?

Sand Control: Why and How?

+

09/12/1991 · sand production may be triggered during the first flow of formation fluid due to drag from the fluid or gas turbulence. This detaches sand grains and carries them into October 1992 41 Sand production erodes hardware, blocks tubulars, creates downhole cavities, and must be separated and disposed of on surface. Completion methods that allow sand

HORIZONTAL WOLFCAMP

HORIZONTAL WOLFCAMP

+

horizontal wells completed in the B bench. The latest two wells IP'd at 1,310 and 1,136 BOE per day, producing 94% liquids. The first was stimulated with 34 stages in a 7,750foot lateral; the second with 28 stages and a 7,700 foot lateral. Estimated ultimate recoveries (EURs) for recent wells on production have increased to